Office Mob: +8615524105871
Office Tel: +86-024-31931990
Office Fax: +86-024-22845391
Email: info@eoexport.com
Operators must be familiar with the general structure and performance of equipment, not the use of ultra-high performance equipment.
The volume of the parts and abrasives shall not exceed 90% of the hopper volume. After the power is connected, it should run smoothly and without abnormal noise. Otherwise, you should stop checking. Before the workpiece is grinded, the workpiece must be treated with oil removal and decontamination. The grinding agent and the amount of water control must be added in the process according to the grinding condition of the workpiece. When the work is finished down, cut off the power supply, clean the equipment, do the equipment maintenance work.
Safety procedures before the boot, should check the fastening screws, check the motor shaft rotation is flexible. The equipment is in operation and the anomaly should be parked. Every 6 months, the bearing of the vibrating motor or rotary shaft should be injected with lithium grease. After work, the power should be cut off.
Second Floor, No.29 Shiyiwei Road, Heping Liaoning Shenyang.
Email:info@eoexport.com
Office Mob: +8618002480485
Office Tel: +86-024-31140175
Office Fax: +86-024-22845391